SVT
Standards Verification Tasklist
A timeline-based R&D approach, structured by TRL phase.
SVT Purpose
Compatibility
Interop with grid, connectors, protocols and ecosystems.
EMC Emissions
Conducted and radiated emissions across the product lifecycle.
Grid
Power quality, anti-islanding, ride-through, V/f response.
Safety
Insulation, isolation, fault protection and product norms.
Three inputs. One structured tasklist.
A TRL development matrix defines what to reach at each stage across 8 dimensions. 100+ standards have been analysed and turned into structured tasks along the TRL timeline. Those two databases form the technical core — matched with the project-specific specification, they turn into a proper SVT.

Less miscommunication. More transparency. Faster execution.
≈70%
Interop with grid, connectors, protocols and ecosystems.
1
Conducted and radiated emissions across the product lifecycle.
∞
Power quality, anti-islanding, ride-through, V/f response.
100%
Insulation, isolation, fault protection and product norms.

